The process of changing from an idea to an industrialized construction project allows all the agents involved to have control of all the constructive processes during the execution of the project. From NIBUG, we turn your idea into an industrialized construction project. How? Thanks to our services!

 

Are you looking for a MODULAR CONSTRUCTION consultancy? READ MORE

 

From an idea to an industrialized construction project

 

  • NIBUG Project: construction project, but you want to optimize it and adapt it to the industrializing processes in order to obtain benefits as soon as possible and with the maximum possible quality. without losing quality. NIBUG works together with the builder and architect to convert your construction project to industrialized construction. How? With BIM. From a manufacturing plan for suppliers, warehouse distribution, logistics and assembly, sealing plan,…
  • NIBUG Construct: offers the service of transforming the project into a constructive project, thanks to new innovative production and construction systems such as Lean Construction. In this case, NIBUG is in charge of searching a local builder.
  • NIBUG PLUS: NIBUG is able to develop the complete construction cycle: from planning and design to construction and project delivery. In this case, NIBUG is looking for the professionals who will take care of the building from the beginning of the project to the turnkey.

 

The main characteristic of NIBUG is that thanks to its experience in the AECO sector, it is able to advise the client on their projects, with the confidence of meeting their requirements and needs, both at a constructive, economic, architectural, social or functional level,…

During the basic project, NIBUG is responsible for verifying that the functional needs and particularities of the territory fit together, through of the team of architects and engineers. Once the studies have been carried out, the 3D digital models are produced in order to manufacture the pieces.

In the construction phase, the idea will become an industrialized construction project and the purchase of materials and equipment necessary to carry out the project will be planned and executed. And the logistics will be studied: How to transport and what dimensions will it have? to facilitate and optimise travel without affecting costs and time, and above all quality.

Finally, a plan will be created to assemble the building: when it is manufactured and delivered to optimize costs and time and not lose quality.

 

Are you interested in taking your idea to an industrialized construction project to the end? Trust in NIBUG to make it happen.

 

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

CERRAR
Powered by WishList Member - Membership Software